Current Projects

A project is “active” when District staff are actively planning for the start of design or have started to expend funding on the project.

On this page, you can find the following active projects:

Rendering of the modern gym building with "Sierra College Home of the Wolverines" sign

New Gym Building / Renovation

81,000 square feet (34,000sf renovation/47,000sf new construction)
Completion: Spring 2025
State and District funded

  • Code compliant, modern, efficient space for PE classes and Athletics
  • New gymnasium
  • Campus drop-off/pick up location from Sierra College Blvd.
Student Campus Housing Rendering

Student Housing

Approximately 124,000 gsf
Completion: Summer 2025

State of California and Self-funded

  • 350 (+/-) beds
  • Adjacent to the Student Union and Library/Learning Resource Center
  • Will house student support services in addition to student residents
Applied Technology Center Aerial View Rendering

Applied Technology Center (ATC) Modernization

37,000 square feet
Construction Start: Fall 2024
State and Measure E funded

This project will modernize and connect the current Automotive Technology and Woods/Metals Technology instructional buildings, which were built in the 1960’s, creating a vocational technology hub on the Rocklin campus. The modernized buildings will be compliant with current building and accessibility codes and reflect current industry technology in the labs and classrooms to support both current and future programs.

Learn more about the NextGen Makerspace (press release)

Rendering of new science building on Sierra Rocklin campus
Rendering by LPA Design Studios

New Science Building

65,000 square feet
Construction Start: Fall 2024
Measure E/State funded

  • New, right sized science labs
  • New planetarium with 120 seats
  • Lobby space for static and dynamic museum exhibits
  • Student collaboration areas on second floor
Front of Weaver Hall building with multi-panel glass and landscaping

Weaver Hall Modernization

32,641 gross square feet
Completion: Spring 2029
Measure E funded

The modernized building will provide current technology instructional spaces and be brought up to current accessibility and building code requirements.

Orange fencing surrounding construction area on Sierra Rocklin campus

Campus Wide Improvements

Project area: Campus-wide
Measure E funded

Campus improvements not directly related to a specific project, such as: 

  • Landscaping between buildings
  • Pedestrian and vehicle circulation
  • Storm water management